Calculation, design, supervision and test of the Banki turbine of 9kw for the Farm Barrantes in Guápiles.
Calculation, design and test of the biomass burner of wood adapted to a kettle of 500 kw to substitute the 100% of the consumption of diesel for the Prentensados Nacionales business.
Design and construction of the biomass burner of corncob of 600 kw for the dried of corn, in the National Counsel of Production.
Installation, maintenance and operation of the tower and wind measurement systems for International Wind Company Cerro Mogote, Miravalles, Costa Rica.
Installation, maintenance and operation of the tower and wind measurement systems for the wind farm project Tejona, Tilarán Instituto Costarricense de Electricidad, ECN, Costa Rica.
Administrative and Technical coordination of the Project of Electrification Fotovoltaíca of Isla Caballo, Service for Instituto Costarricense de Electricidad and The Embassy of Holland, Costa Rica.
Design and implementation of the gasification of biomass (firewood, parchment and brush) in the dried of Coffee, Beneficio Volcafé, 580 kw thermal.
Design, production and installation of hydroelectric Project Coope San Juan, Altamira, San Carlos, 5 kw synchronized to network.
Design and installation of hydroelectric project in Miramar, Puntarenas, for poultry farm, 10 kw.
Guide and advice in the identification of wind farm places for the development of wind farm in the Central Valley for Compañía de Fuerza y Luz, S. A., Plantel Virilla, Coronado and Escazú, Costa Rica.
Prefactibilidad technical-economic and draft for the cardboard waste employment through gasificadores in the replacement of diesel for Deloitte Ross Tohmatsu.
Study of Economic and Technical Feasibility of the replacement of the firewood by the brush of the coffee in the dried of the same one. Study of the prototype of a press for the brush and recommendations for the design of an oven for dried of the brush.
Optimization electric power Plant of 15 Kw and system of broadcast and distribution in La Tigra de San Carlos, Costa Rica.
Study of Maxi Eolic Feasibility Liberia, 100kw, Corporation Supermercados Unidos – Wal-Mart Central America.
Design of the "PROGRAM OF CAPACITACION FOR THE FORMACION OF PROFESSIONALS OF THE PUBILC SECTOR AND PRIVATE SECTOR ON RENEWABLES ENERGIES IN COORDINACION WITH NATIONAL UNIVERSITIES" in Nicaragua, Program of the United Nations for the Development (PNUD) and the National Commission of Energy of Nicaragua (CNE) as part of the Project of Small hydroelectric power stations.
Eolic measurement systems installation for the Project of Rural Electrification for Remote Zones (PERZA) WORLD BANK-NIC P073246 National Commission of Energy of Nicaragua (CNE).
Due Diligence, of the Hydrologic Study, Technology and Hydroelectric Project Work Advance La Joya, 15 MW. Generator of Energy of Peru – GEPSA and Construction and Mining, S. A.
Supervision of Installation and electronic assembly of towers and wind measurement systems, wind farm project The Innocent, 60 MW.
Analysis of eolic resource through the software "Windowgrapher" and "Wind Atlas Analysis and Application Program" (WAsP)
Verification for investment of the Diesel-Eolic Hybrid Project UPCO, 3MW, Utila, Honduras, Bank AND + Co.
Lands appraisal plans review for wind farm projects, sale, rent and payment by production for the wind farm project The orange blossom, 10MW - 30MW, Negotiations CEMEX and WPD Energy (Germany).
Local Technical advisor, Study of wind farm Feasibility San Buenaventura, 15 MW, Geoingeniería Consultants – Ecofys, Costa Rica
Study for wind farm Feasibility Malabrigo, 100Mw, Petroleum Monterrico, S. A., Malabrigo, La Libertad, Peru.
Study for wind farm Feasibility La Brea, 200Mw, Petroleum Monterrico, S. A., La Brea , Talara, Piura, Peru.
Study for wind farm Feasibility El alto, 400Mw, Petroleum Monterrico, S. A., El Alto, Piura, Peru.
Rural Electrification Project Feasibility study The Andes, HOIST/PNUD, Chirripó Consultants, La Cruz, Guanacaste, Costa Rica.